DITAPEnergy

Solutions / Energy

Boards and transfer.

Coordinate the network and backup of your system.

An electrician, wearing gloves, is testing the contacts of a control panel using a multimeter.

What we are solving.

We designed the font transfer process based on the project’s circuits and equipment. The continuity during switching depends on the design and the backup system chosen; this is verified during the initial startup.

What does the work include?

  • Circuit review and capacity assessment.
  • Design of the board and protective elements.
  • Definition of execution and applicable authorizations
  • Documented transfer proof

For whom.

  • Companies that already have or are planning to install a large generator or UPS.
  • Hotels and plants that require automatic, rather than manual, switching of water sources.
  • New projects that require the board to be designed from the outset.

From diagnosis to delivery.

01

To diagnose

We reviewed consumption, infrastructure, and critical loads.

02

To measure

We defined autonomy, alternatives, and a budget.

03

To implement

We coordinated responsibilities, access points, and work schedules.

04

To check.

We documented the evidence and agreed on maintenance.

The next step.

Let's plan your business continuity.

Tell us where you are and what you need help with.

Evaluate my installation.